more_reports

Ben Pirie

Atrium Research

Recent Articles about Lake Victoria Gold Ltd.

Tanzania Gold Developer Hits 28.71 g/t Au at Planned Starter Pit, Launches Weathered-Ore Met Program 08/27/2026

A Tanzania-focused gold developer reported shallow, high-grade drill results at its planned initial open pit and launched metallurgical testwork to finalize the flowsheet.

Tanzania-Focused Gold Developer Delivers Maiden 580 Koz Resource Next Door To Barrick's Bulyanhulu Mine 08/11/2026

A gold explorer and developer reported a maiden resource of roughly 580 Koz at its Tembo Project in Tanzania, alongside a potential near-term toll-milling route.

Tanzania-Focused Gold Developer Kicks Off Phase 3 Land Program as Imwelo Construction Begins 07/31/2026

A Tanzania-focused gold developer is starting a Phase 3 land program at its fully permitted Imwelo project, days after Phase 1 earthworks began physical construction.

Tanzania-Focused Gold Developer's Sterilization Drilling Clears the Way for Construction 06/24/2026

Tanzania-Focused Gold Developer's Sterilization Drilling Clears the Way for Construction

Tanzania Gold Co. To Advance Imwelo and Tembo Projects Toward Production 04/02/2026

Lake Victoria Gold Ltd. (LVG:TSX; LVGLF:OTCQB; E1K:FSE) secured a US$25M gold loan facility with Monetary Metals and a CA$3M convertible debenture, with key catalysts including Imwelo construction and a potential toll milling deal at Tembo expected to drive near-term production, noted Atrium Research.

Gold Co. Confirms 97% Gold Recovery at Imwelo, Construction on Track for 2026 as Key Catalysts Approach 03/18/2026

Lake Victoria Gold Ltd.'s (LVG:TSX; LVGLF:OTCQB; E1K:FSE) metallurgy testwork confirmed up to 97% gold recoveries at the fully permitted Imwelo Project, with construction targeted for later in 2026, first gold expected in 2027, and ongoing Barrick drilling at Tembo offering additional upside, according to an Atrium Research note.

Gold Co. Completes Drill Program, Confirms Pit Expansion Potential 02/18/2026

The completion of the Area C Drill Program at Lake Victoria Gold's (LVG:TSXV, LVGLF:OTCQB) Imwelo Gold Project in Tanzania confirmed down-dip and east-west mineralization extensions, supporting final pit design and advancing the project toward construction in Q2Q3 2026 and first gold production in 2027, noted an Atrium Research flash.

BC-based Gold Co. on Path to Production 02/04/2026

Lake Victoria Gold Ltd. (LVG:TSX; LVGLF:OTCQB; E1K:FSE), on the path to production at its Imwelo gold project in Tanzania, boasts exploration upside, strategic partnerships and motivated management, noted an Atrium Research report. Read on to learn more about this Buy-rated explorer-developer.